Race Pace and Strategy Planner
Turn a recent race or time trial into a projected finish, equivalent times across every distance, target splits, and a full race-day pacing plan.
1Your recent race
Two or more races at different distances fit your own endurance curve from data, more accurate than the profile setting, and let the goal check use your real range.
2The race you're planning
When set, this sets how well your pace holds over distance from your data and overrides the picker above. Volume drives durability most, quality sharpens speed, strength helps hold form late.
3Refine for this event
Optional. Tick what applies to your race.
Upload your course first. That unlocks the hiking model and the undulating pacing plan.
Editing the gain after a GPX upload rescales the course to your figure, useful since raw GPX ascent often reads high.
Reads your GPX and paces every kilometre on the measured cost of running up and down. Power-hiking steep climbs and run-walk breaks live in the Hiking and walking panel under Ultra options.
Heat slows longer races most, and hits slower runners harder; humidity and altitude compound it. Set them to your race-morning forecast.
For the hard sections of an ultra. Climbs above the threshold are power-hiked, and descents below the descent threshold (0 is off) are walked. Needs a course loaded in Course and terrain.
For an ultra target, this anchors your flat pace to a real ultra result instead of a generic curve, far more accurate for anyone with ultra history.
Each line is a distance in km and an optional cutoff as elapsed time from the start (h:mm:ss).
Current to projected
Your recent result set against the race you're planning.
Target splits
Run the second half faster and it's a negative split, the pattern most distance racing evidence favours. Hold one pace and it's even. Start faster than you finish and it's positive. Follow the hills and it's undulating, holding effort steady so pace rises on the climbs and drops on the descents.
Checkpoints and cutoffs
Projected time at each point on your plan.
| Checkpoint | Elapsed | Clock | Cutoff | Margin |
|---|
Equivalent performances
What your recent result projects to across the standard distances.
| Distance | Time | Pace /km | Pace /mi |
|---|

